Roseville residents will soon be dealing with more road construction impacts. Signal work at the intersection of Lydia Ave. and Snelling Ave. is scheduled for July 26 through August 6 that will result in some closures.
Lydia Ave. will be closed at the intersection with the exception of northbound traffic on Snelling Ave. Traffic will be detoured via Lincoln Dr., County Road C2 and East Snelling Dr.
Drivers are asked to use caution when driving in the area and follow detour signs. Contact Assistant City Engineer Stephanie Smith at 651-792-7048 or stephanie.smith@cityofroseville.com if you have questions